EUTELSAT 3B Mission Status Update

EUTELSAT3B

eutelsat-3b 1

During the final “dry” roll-out phase of integrated launch vehicle (ILV) processing at Home Port in support of the EUTELSAT 3B mission, a discrepancy in the nominal movement of the cable-mast and the Zenit-2S LV lateral plate occurred while installing the ILV onto the launch pad. This caused mechanical damage to the lateral plate housing located on the inter-stage truss of the LV. Resolution of this condition will result in a delay to the planned April 15, 2014 launch date.

A decision was made to de-mate the Payload Unit and Block-DM-SL onboard the Sea Launch Commander to resolve the issue, establish the root cause and perform additional checks of the interface between the launch vehicle and ground support equipment connectors.

Once the above tasks have been completed, Sea Launch will announce an updated schedule and launch day for EUTELSAT 3B.

adn.firetrench.com

 

ftd.firetrench.com

Leave a Reply