Maxum Petroleum unveils latest bunkering vessel; Another LCS experiences an engineering casualty

MaxumPet

 

Maxum Petroleum unveils latest bunkering vessel
August 30, 2016 —The Global Provider, Maxum Petroleum’s newest bunkering vessel, is currently under construction at Jesse Co. in Tacoma, WA, and expected to enter service in January 2017.

bbn.firetrench.com

Another LCS experiences an engineering casualty
Coronado is operating under its own power with a speed restriction of 10 knots and is being escorted by USNS Henry J. Kaiser.

C-Job Naval Architects to design 8,000 dwt rotor sail vessel
The new design, the FF8000, will be for an 8,000 dwt dry cargo ship and, while based on the FF4500 design, will include a number of modifications.

Two more LNG carriers to have WinGD dual fuel engines
The ships are scheduled for delivery in 2019 with engines being supplied in Feb 2018 for the first vessel and in April 2018 for the second.

BV classes newbuild LNG fueled tanker
The 15,000 dwt Ternsund is the first vessel to be powered by a dual-fuel two-stroke engine using the low-pressure X-DF gas admission technology developed by Winterthur Gas & Diesel.

Leave a Reply